Case studies energy efficiency reduce greenhouse emissions climate change


Major poultry processor generates power, hot water and steam from cogen installation.

Maple Lodge Farms cogeneration installation cuts energy costs across the board with 86% efficiency.

At A Glance:

• Cogeneration system produces 5 MW electric power, 4 million lbs steam (at 125 psig) weekly and 125,000,000
gallons of hot water annually.
• System installation has extremely low emissions, anticipating tighter restrictions.
• Electric power costs cut from $0.065 to $0.05 kWh.
• Estimated annual reduction in consumption of natural gas 680,000 m3.


Processing about 300,000 chickens daily, Maple Lodge Farms, near Norval, Ontario produces whole chickens, cutup chicken parts and processed chicken products for the wholesale, retail and export markets. About 25% of all chicken products sold throughout Ontario emerge from the Maple Lodge facilities.
Because strict sanitary conditions are employed at all stages of the processing, substantial volumes of electric power are consumed – as high as 9.5 MW in summer months. Processing also
requires hot water and steam as well. During the twice-daily production shifts, water heated to 120˚F (49˚C) is employed, and more water, at 140˚F (60˚C) is needed for nightly clean-up operations. In all, about 2,273,000 litres (500,000 gallons) of hot water are required daily.

Until recently, the hot water was produced by various interconnected equipment including a Kemco direct-contact water heater, a 400 kW heat pump and five 350 hp boilers. The boilers ranged in age from 6 to 15 years.

Finding the right fit and rationalizing the investment

Alan Wassens, Engineering / Services Manager at the Maple Lodge plant, recognized the potential benefits of cogeneration. “It was a matter of finding the right fit,” he says, “and rationalizing the financial investment.”

In late 1997, Wassens found an ideal fit for the plant’s needs, and the discovery coincided with a growing awareness of possible future restrictions on the emission of greenhouse gases. “The desire to reduce missions prompted us to take a close look at our old boilers,” Wassens recalls. “When we realized they wouldn’t measure up to the required performance levels, we decided to take a proactive position and go the cogeneration route.”

Wassens and his Maple Lodge team established their cogeneration needs: 5 MW of electric power (representing
about half the plant’s peak demand), 4 million pounds of steam weekly (at 125 psig), and about 570,000,000 litres (125,000,000 gallons) of hot water annually. A capital cost budget for an installation meeting these pecifications was set at between $7.5 and 9 million. Working closely with both Energy Engineering Corporation
of Sarnia and Daniel Chum, an Energy Solutions Consultant with Enbridge Gas Distribution, the Maple Lodge team chose a Solar 5.2 MW natural gas turbine/generator to meet their electrical needs and an ERI heat-recovery steam generator (HRSG) for the plant’s steam requirements. To provide the flexibility needed to meet a projected future demand for 65,000 lb/hr of steam, a natural gas duct burner was installed between the gas turbine outlet and the HRSG inlet.

At the discharge from the economizer, a Sofame direct-contact water heater was installed to recover an additional 12 million Btu/hr from the flue gas, which is used to heat 300 IPGM of hot water at 120˚F (49˚C).

Lease contract offers several benefits

Covering the capital cost is a five-year lease contract obtained through Royal Bank. The arrangement created an immediate positive cash-flow situation with off-the-balance-sheet financing. At the end of the five-year term, Maple Lodge will own the cogeneration facility outright. To ensure future expansion room for the main processing plant, the cogeneration system was installed in a separate 6000-square foot building, which also reduced the need for expensive sound-deadening materials in the facility. The installation was supervised by Energy Engineering and was completed in 1998. The secret, according to Energy Engineering president Tom O’Farrell, was in the details. “We did a good deal of pre-assembly,” O’Farrell explains, “working to within a sixteenth of an inch, and this helped us to assemble and install the entire system in just a few months.”

The new system has met or exceeded expectations. Electricity costs have been cut from between 6 and 7 cents to about 5 cents per kWh, and energy efficiency has been estimated as high as 86 per cent.

Based on current steam requirements, projections indicate an annual reduction in energy consumption, compared with their existing boilers, of 680,000 m3 of natural gas. Under the Enbridge Gas Distribution Energy Efficiency Program (EEP), Maple Lodge Farms qualified for a $30,000 cash grant.

Maple Lodge Farms has established a leadership position in its industry for both high quality in its products and high efficiency in its operations. The addition of multiple benefits made possible by the cogeneration installation is serving to enhance this reputation even further and perhaps most important of all, bolster its position in a highly-competitive marketplace.


Read more about how to reduce greehnouse gases

View as pdf file 
 
 
Home   |   Sitemap   |   Français
About Sofame  |  Greenhouse Gas Emission Reducing Products  |  Projects about energy saving in industrial heating  |  Sofame Investors Information  |  Contact us
Unique Feature: Touch Screen Control System  |  Custom-Made Solutions - Very High Efficiency, Close to 95%
Most Extensive Guarantee in the Market  |  Reduction of Greenhouse Gas Emissionshot water heating system | cap-and-trade systemcarbon offsets | waste heat recovery